Records Found : 3
Posting Date Deadline Location Short Description Notice Type Value
01-Jul-2026 15-Jun-2026 new caledonia study, design, and construction of a hydroelectric pumped storage facility (pumped storage plant) with 100 mw generating capacity (130 mw in pumping)
View Tender Detail
tenders Refer Document.
03-Jun-2026 15-Jun-2026 new caledonia study, design, and implementation of a hydro-electric development of the step type (pumped storage power system)
View Tender Detail
tenders Refer Document.
01-May-2026 15-Jun-2026 new caledonia study, design, and implementation of a hydro-electric development
View Tender Detail
tenders Refer Document.

Some of Our Valuable Clients